LNG Station SCADA System

LNG Station SCADA System
Details:
Using SIEMENS PLC and industrial configuration software to collect, store, record, display, remote upload and monitor the data of LNG/L-CNG station equipment. Main equipment: field instrument, PLC control cabinet, frequency conversion power distribution cabinet, monitoring computer and alarm system.
Send Inquiry
Description
Send Inquiry

Advantage:

  • High automation: one-touch operation, the operators can skillfully operate this system through simple training, which can prevent the wrong operation causing damage to personnel and equipment.
  • High safety: interlocking control of ESD alarm, combustible gas alarm, flame alarm, field equipment overtemperature and overpressure alarm etc.
  • Real-time monitoring the electric current of running cryogenic immersed pump, the temperature of pump pool and the cross pressure of pump, which will bring multi-protection to the pump and extend the service life of pump.
  • Automatically switch constant frequency mode and frequency conversion mode of cryogenic immersed pump to meet the pressure demand of different technical modes.
  • Control the automatic start-stop of cryogenic high-pressure plunger pump according to the pressure of gas storing device, which assures to supply stable pressure for CNG dispensers.

Hot Tags: lng station scada system, China lng station scada system manufacturers, plc building automation, plc control system, automation of automation, tank automation system, automation production systems, any automation

Send Inquiry